Basis Stress testing is similar to integration testing. The downside is that the test
can hardly ever be
done manually. The objective behind a basis stress test is to ensure that the hardware and system
parameters have been configured to meet the users typical demand.
The problem is that if the test can be done once, it can hardly be repeated in the
same manner after
the parameters have been re configured.
Siamease allows complete business processes that represent the general business day
to day
workload to be automated. The basis team can execute a Siamease script to post 10000
documents across the business spectrum, whilst monitoring database workload, network load and
other basis measures. The same test can then be performed at different geographic locations to
ensure that network settings are correct. After any system changes have been implemented, the
basis team can execute the same set of tests again and again, until a measurable improvement has
been achieved. These tests can also be conducted outside of main work hours.